The project provided a milk powder dryer and packing building at the Edendale site. This is the biggest milk powder dryer in the world, producing approximately 30 tonnes of milk powder an hour.

The structure required innovative engineering techniques providing a large building to house the dryer 56m high and 31m wide. The packing area also required a large volume.

Stiles and Hooker designed a building 75mx30m wide and 21m high for the packing equipment.