Otumoetai College
CLIENT
Otumoetai College
LOCATION
Otumoetai
COMPLETED
2002
VALUE
$7.4m
Otumoetai College
A forecast roll growth up to 1800 pupils provided the platform for a total redevelopment of an existing college campus.
The constrained site posed limitations on the development. The referred brief required a Master Plan detailing alterations to classroom configurations, building positions and new buildings.
The development was completed in 2002