Stiles & Hooker were engaged by Foster Construction Limited to transform a greenfield site in the Te Rapa Gateway into a quality development for companies to invest and grow in.

The Stiles & Hooker team created an industrial focused, function driven design using panelised ACM panel vertical long run iron and double height glazing for the 5 Industrial units, each consisting of an office & warehouse space that could be unit titled in the future.

The construction utilised concrete floors, precast concrete wall panels, steel framing, and timber framed offices.