Biomass Fired Boiler at Nestle milk processing site at Osorno, Chile. Stiles and Hooker were engaged by RCR Energy to design the boiler plant supports and access structures.

The engagement was then extended to include the design of the boiler foundations, and the boiler enclosure building. The architecture team at Stiles and Hooker were engaged to come up with proposals for the exterior aesthetics of the project, while the engineering team ensured the efficiency and quality of the structure was at its best. Working collaboratively the team created a design that was both architecturally pleasing and efficiently functional.